    Gas to Power Plants

    Gas to Power is a gas-based electricity supply solution that serves both internal and external needs through Captive Power Plant (CPP) and Independent Power Producer (IPP) schemes.

    Gas to Power for a Lower-Emission Energy Transition

    Compared with coal-fired plants, gas-based power generation produces lower carbon emissions, making it a strategic step in supporting the national energy transition.

    Combined Cycle Gas: 1,760 MW

    March 2024Commercial Operation Date
    Kapal FSRU Jawa Satu di perairan lepas pantai
    Menara transmisi listrik tegangan tinggi
    25 YearsPPA Contract (PLN)
    PLTGU Jawa Satu pada senja hari
    ~USD 1.8 billionTotal Investment
    CilamayaWest Java, Indonesia

    Equity Partners:

    RU II Dumai Gas Engine

    Gas engine power plant for refinery operational efficiency

    • 12.9 MWInstalled Capacity
    • August 2023Commercial Operation Date
    • ~USD 1.5 millionCost savings vs. a 5 MW plant

    Our Documentation

    This growth was driven by operational optimisation and contributions from strategic projects, including the solar plant in the Pertamina Hulu Rokan operating area.

    • Pertamina NRE workers in front of the Jawa Satu combined-cycle power plant
    • The Jawa Satu combined-cycle power plant at dusk
    • Two workers in the gas power plant area