    Solar Power Plants (PLTS)

    The solar power plants managed by PNRE supply electricity to a range of off-takers while accelerating the development of green energy in Indonesia.

    Warga di bawah rangka panel surya yang juga dipakai bertanam sayur
    250+ solar PV sitesSpread across Indonesia
    58,711 MWhTotal electricity generation
    Dua pekerja meninjau hamparan panel surya
    Pekerja berjalan di antara larik panel surya
    +105,73%Generation growth
    54.32 MWpTotal installed capacity

    Performance & Growth

    Throughout 2024, electricity generation from PNRE's solar power plants reached 58,711 MWh, a significant increase of 105.73% compared with 2023.

    This growth was driven by operational optimisation and contributions from strategic projects, including the solar plant in the Pertamina Hulu Rokan operating area, which was in full operation throughout the year.

    Pertamina Internal

    • PLTS Sei MangkeiSei Mangkei2 MW
    • PLTS DumaiDumai2 MW
    • PLTS RokanRokan26 MW
    • PLTS CilacapCilacap1,34 MW
    • PLTS BadakBadak4 MW
    • RU V BalikpapanRU V Balikpapan2.5 MWp

    Solar Power Plants (PLTS)

    Memuat peta...
    • PLTS Sei Mangkei. Kapasitas: 2 MW. Lokasi: Sei Mangkei, Sumatera Utara. Pengurangan karbon: +4 ribu ton CO2eq/tahun. Setara penanaman: 190.476 pohon/tahun.
    • PLTS Dumai. Kapasitas: 2 MW. Lokasi: Bukit Datuk, Riau. Pengurangan karbon: +3 ribu ton CO2eq/tahun. Setara penanaman: 142.857 pohon/tahun.
    • PLTS Rokan. Kapasitas: 26 MW. Lokasi: Duri, Riau. Pengurangan karbon: +23 ribu ton CO2eq/tahun. Setara penanaman: 1.095.238 pohon/tahun.
    • PLTS Cilacap. Kapasitas: 1,34 MW. Lokasi: Lomanis, Jawa Tengah. Pengurangan karbon: +2 ribu ton CO2eq/tahun. Setara penanaman: 95.238 pohon/tahun.
    • PLTS Badak. Kapasitas: 4 MW. Lokasi: Bontang, Kalimantan Timur. Pengurangan karbon: +13 ribu ton CO2eq/tahun. Setara penanaman: 619.048 pohon/tahun.
    • RU V Balikpapan. Kapasitas: 2.5 MWp. Lokasi: Balikpapan.
    • 250+ solar PV sitesSpread across Indonesia
    • 54.32 MWpTotal installed capacity
    • 58,711 MWhTotal electricity generation